4.7 Article

Deliverable Robust Ramping Products in Real-Time Markets

期刊

IEEE TRANSACTIONS ON POWER SYSTEMS
卷 33, 期 1, 页码 5-18

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TPWRS.2017.2688972

关键词

Capacity reserve; marginal price; ramping reserve; ramping products; robust optimization

资金

  1. U.S. National Science Foundation [ECCS-1549937]
  2. Cleveland State University Faculty Start-Up Fund
  3. Directorate For Engineering
  4. Div Of Electrical, Commun & Cyber Sys [1549937] Funding Source: National Science Foundation

向作者/读者索取更多资源

The increasing penetration of variable energy resources has led to more uncertainties in power systems. Flexible Ramping Products (FRP) have been adopted by several electricity markets to manage the uncertainties. We reveal that neglected line congestion for FRP may not only cause infeasibility, but also result in a failure of cost recovery. To address the deliverability issues on FRP, this paper proposes a new concept, Deliverable Robust Ramping Products (DRRP), in real-time markets. The DRRP includes generation ramping reserve and generation capacity reserve. The DRRP is deliverable and immunized against any predefined uncertainty. It also fully addresses the bid cost recovery issue caused by the line congestion in existing FRPs. The prices of DRRP are derived within the Affine Adjustable Robust Optimization (AARO) framework. These prices can be used to identify valuable reserves among available reserves and quantify the values of flexible resources that provide reserves. This paper also proposes a general approach to obtaining the time-decoupled prices for DRRP and generation, which can be used for themarket settlement of the first interval only in real-time markets. Simulations on a 3-bus system and the IEEE 118-bus system are performed to illustrate the concept of DRRP and the advantages of DRRP compared to existing FRP.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据