期刊
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS
卷 54, 期 2, 页码 1039-1046出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TIA.2017.2785761
关键词
Demand resource (DR); demand response resource (DRR); electricity capacity market; market clearing price (MCP); transmission expansion planning (TEP)
资金
- Energy Production and Infrastructure Center (EPIC) of the University of North Carolina at Charlotte
Demand response cannot only be used as a power supply resource to produce a negawatt in high power prices or when the reliability of the grid is threatened, but can also be applied to resolve a transmission expansion planning problem instead of implementing a costly and complex transmission upgrade solution. Essentially, the demand response resources (DRRs) can relieve the capacity requirement for a load area, and thereby relieve the import transmission requirement. This paper explores the role of DRRs as an alternative solution to the required transmission upgrades in the context of a proposed capacity market modeled based on Pennsylvania-New Jersey-Maryland (PJM) capacity market model. Numerical results show that the DRRs can indeed replace the needed transmission upgrades.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据