IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS
卷 14, 期 11, 页码 5029-5037出版社
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TII.2018.2833441
关键词
Battery; Bender decomposition; demand response; HVAC
类别
资金
- USF Electrical Engineering Department
The objective of this engineering problem is to determine the size of a battery energy storage system and number of photovoltaic (PV) panels to be installed in a building with Heating Ventilation and Air Conditioning systems (HVACs) as the main load. The building is connected to the power grid where electricity price is varying at different hours. This engineering problem is formulated as an optimization problem with a goal to achieve minimum installation cost and operation cost while satisfying room temperature requirements. Stochastic PV outputs are taken into consideration as well. The mathematical problem formulated is a large-scale mixed integer linear programming (MILP) problem. To improve the solving speed, two Benders decomposition strategies are applied to solve this stochastic MILP problem. The optimization problem will lead to the battery energy capacity, power limit, number of PV to be installed, as well as the on/off status of HVACs over 8 h. The contribution of this paper is the implementation of Benders decomposition methods to reduce the computation complexity. Parallel computing structure and maximum feasible subsystem cut generation strategy have been exploited and implemented in this research.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据