4.2 Article

Transmission Expansion Planning Considering an Hourly Demand Curve

期刊

IEEE LATIN AMERICA TRANSACTIONS
卷 16, 期 3, 页码 869-875

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TLA.2018.8358667

关键词

Transmission expansion planning; security criterion; transmission losses; load duration curve; MILP

向作者/读者索取更多资源

This paper discusses the impact that different approximations have on the Transmission Expansion Planning (TEP) problem. Due to the long decision horizons involved, the number of variables can make the problem intractable if approximations to the problem are not made. Furthermore, new emerging technologies and changes in the way we operate our systems are putting under scrutiny some of the approximations usually made to the problem. In this context, this paper evaluates the effect on investment and operational costs of including operational constraints of generators (ramping), transmission losses, and N-1 security constraints on the TEP problem. TEP is formulated as a mixed-integer linear program (MILP). We first validate our analysis using the Garver test system. Then, the importance of including the aforementioned constraints to TEP is tested with the 24-bus and 118-bus IEEE systems. Our results show that additional transmission capacity may be required to satisfy the flexibility requirements caused by net load ramps.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据