4.7 Article

Numerical study of transition zone between ballasted and ballastless railway track

期刊

TRANSPORTATION GEOTECHNICS
卷 3, 期 -, 页码 58-67

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.trgeo.2015.05.001

关键词

Transition zone; High-speed railway embankment; Moving loads

向作者/读者索取更多资源

Track stiffness plays an important role in design and construction stages of the railway track. Smoother travel and longer life time of a track depend on the immutable track stiffness. Nevertheless, changing the track stiffness is inevitable, especially in the transition zone, where the slab track connects to a conventional ballasted track. In this zone track stiffness changes abruptly and it causes differential settlement, which is the main cause for degradation of tracks and foundations at transition zones. A number of remedies have been proposed or used to provide gradual stiffness transition, such as the use of gradual pad stiffness, long sleepers and auxiliary rail in the transition zone. The emphasis of this study is held on the assessment of the behavior of different types of the transition zone under the train moving loads. For that reason, well-known commercial finite-element method package has been used to investigate the dynamic behavior of the transition zone under the passage of high-speed trains. The results of the dynamic analysis are presented and compared in two circumstances; one considering the common improvement in the superstructure by installing auxiliary rails or gradually increasing the length of the sleepers in transition area, and the other by enhancing the substructure through constructing two-part transition section. (C) 2015 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据