4.7 Article

Optimal workforce assignment to operations of a paced assembly line

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 264, 期 1, 页码 200-211

出版社

ELSEVIER
DOI: 10.1016/j.ejor.2017.06.017

关键词

Workforce assignment; Scheduling; Complexity analysis; Mixed integer linear programming; Heuristics

资金

  1. European project amePLM [285171]

向作者/读者索取更多资源

We study a paced assembly line intended for manufacturing different products. Workers with identical skills perform non-preemptable operations whose assignment to stations is known. Operations assigned to the same station are executed sequentially, and they should follow the given precedence relations. Operations assigned to different stations can be performed in parallel. The operation's processing time depends on the number of workers performing this operation. The problem consists in assigning workers to operations such that the maximal number of workers employed simultaneously in the assembly line is minimized, the line cycle time is not exceeded and the box constraints specifying the possible number of workers for each operation are not violated. We show that the general problem is NP-hard in the strong sense, develop conventional and randomized heuristics, propose a reduction to a series of feasibility problems, present a MILP model for the feasibility problem, show relation of the feasibility problem to multi-mode project scheduling and multiprocessor scheduling, establish computational complexity of several special cases based on this relation and provide computer experiments with real and simulated data. (C) 2017 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据