4.5 Article

Quantifying the complexity of transportation projects using the fuzzy analytic hierarchy process

期刊

INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
卷 33, 期 6, 页码 1364-1376

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ijproman.2015.02.007

关键词

Complexity; Project complexity; Transportation projects; Transportation construction; Fuzzy AHP

向作者/读者索取更多资源

Transportation projects are increasingly complex. A systematic approach for measuring and evaluating complexity in transportation projects is imperative. Thirty six project complexity factors were identified specifically for transportation construction. Using factor analysis, this study deduced the six components of project complexity, namely sociopolitical, environmental, organizational, infrastructural, technological, and scope complexity. The Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method was employed to determine the weights of the components and parameters of project complexity. Sociopolitical complexity was the most defining component of complexity in transportation construction. A complexity level (CL) was proposed to measure the overall project complexity. The application of the proposed approach was demonstrated in a case study of three transportation projects performed by a heavy construction company. As a quantitative measure CL enables managers to better anticipate potential difficulties in complex transportation projects. As a result, scarce resources will be allocated efficiently among transportation projects in a company's portfolio. (C) 2015 Elsevier Ltd. APM and lPMA. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据