4.5 Article

A novel operation chart for cascade hydropower system to alleviate ecological degradation in hydrological extremes

期刊

ECOLOGICAL MODELLING
卷 384, 期 -, 页码 10-22

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ecolmodel.2018.05.025

关键词

Optimized operation chart; Limited ecological curve; Ecological conservation degree; Cascade hydropower stations

类别

资金

  1. National Natural Science Foundation of China [U1765201, 51609061]
  2. Fundamental Research Funds for the Central Universities [2018B11314]
  3. CRSRI Open Research Program [CKWV2016370/KY]
  4. Major science and technology program of water conservancy of Hunan Province [[2016]194-21]
  5. Water conservancy science and technology program of Hunan Province [[2015]245-13]
  6. Open Fund Research of State Key Laboratory of Hydraulics and Mountain River Engineering [SKHL1621]
  7. Priority Academic Program Development of Jiangsu Higher Education Institutions (PAPD)

向作者/读者索取更多资源

Incorporating limited ecological curves, a novel operation chart optimization method is proposed for the multipurpose hydropower systems, which is capable of improving power generation and overall ecological condition and alleviating ecological degradation under extreme dry or wet conditions. The method mainly includes: (1) determine the optimal ecological discharge using weighted usable area-discharge curve based on the physical habitat simulation model (PHABSIM); and (2) establish the operation chart optimization model aiming to maximizing power generation and overall ecological condition and solve the model with DPSA; then (3) derive the limited ecological curves and incorporate them in the operation chart. A case study is performed with Jasajiang (JS) and Madushan (MDS) reservoirs on the Yuan River in southwestern China. The results show that the optimized operation charts result in a 1.72% and 5.99% increase in hydropower generation and a 0.27% and 1.13% increase in ecological conservation degree for MDS reservoir, respectively. In addition, the frequency of ecological damage is reduced from 6.11% to 1.11% for JS reservoir and from 26.67% to 3.89% for JS and MDS reservoirs, respectively. A further discussion using a time series of random runoff generated by first-order Markov model has confirmed the adaptability of this operation chart. The feasibility and potential applications of this operation chart has been confirmed.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据