期刊
COMPUTERS & INDUSTRIAL ENGINEERING
卷 115, 期 -, 页码 342-353出版社
PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cie.2017.11.020
关键词
Flow-shop; Scheduling; Maintenance; Proactive
资金
- National Natural Science Foundation of China [71171130, 61473211, 71502129]
This paper deals with the integration of production scheduling and maintenance planning in order to optimize the bi-objective of quality robustness and solution robustness for flow shops with failure uncertainty. First, a proactive model is proposed to formulate the problem mathematically. Then, Monte Carlo sampling method is adopted to obtain the objective value for feasible solutions and a surrogate measure is proposed to approximate the objective function efficiently. Based on the sampling method and surrogate measure, a two-loop algorithm is devised to optimize the sequence of jobs, positions of preventive maintenances and idle times simultaneously. Computational results indicate that solution robustness and stability of quality robustness can be significantly improved using our algorithm compared with the solutions obtained by the traditional way.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据