3.8 Proceedings Paper

Analysis of Natural Gas Engine De-Loading on LNG Fuelled Vessels

期刊

3RD TRONDHEIM GAS TECHNOLOGY CONFERENCE
卷 64, 期 -, 页码 73-82

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.egypro.2015.01.010

关键词

Liquefied Natural Gas (LNG); Tank mixing; Pressure Build Up Unit (PBU); De-loading; Natural Gas (NG) Engine; Norwegian Coast Guard (Kystvakten)

向作者/读者索取更多资源

Onboard the Norwegian Coast Guard vessel KV Bergen, as well as other LNG fuelled vessels, there has been reports of a sudden fall in the fuel tank system pressure, resulting in de-loading of the NG engines. This study examines the factors which caused the LNG tank pressure on KV Bergen to fall, leading to the de-loading of the Natural Gas (NG) engines. One reason for the drop in tank pressure is that external disturbances from rough seas destroy the liquid surface layer, causing an increase in the rate of condensation occurring inside the tank. The rate of heat and mass transferred to the vapor section by the Pressure Build Up (PBU) unit is less than the heat and mass absorbed during the mixing inside the LNG tank. A process is developed to calculate the possible fall in LNG tank pressure caused by complete mixing of the liquid and vapor. Published by Elsevier Ltd.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据