4.4 Article

An estimation of distribution algorithm and new computational results for the stochastic resource-constrained project scheduling problem

期刊

FLEXIBLE SERVICES AND MANUFACTURING JOURNAL
卷 27, 期 4, 页码 585-605

出版社

SPRINGER
DOI: 10.1007/s10696-015-9210-x

关键词

Stochastic resource-constrained project scheduling; Estimation of distribution algorithm; Permutation-based local search; Impact of problem parameters

资金

  1. National Key Basic Research and Development Program of China [2013CB329503]
  2. National Science Foundation of China [61174189]
  3. Doctoral Program Foundation of Institutions of Higher Education of China [20130002110057]

向作者/读者索取更多资源

In this paper we propose an estimation of distribution algorithm (EDA) to solve the stochastic resource-constrained project scheduling problem. The algorithm employs a novel probability model as well as a permutation-based local search. In a comprehensive computational study, we scrutinize the performance of EDA on a set of widely used benchmark instances. Thereby, we analyze the impact of different problem parameters as well as the variance of activity durations. By benchmarking EDA with state-of-the-art algorithms, we can show that its performance compares very favorably to the latter, with a clear dominance in instances with medium to high variance of activity duration.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.4
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据