4.7 Article

Knowledge dynamics-integrated map as a blueprint for system development: Applications to safety risk management in Wuhan metro project

期刊

AUTOMATION IN CONSTRUCTION
卷 93, 期 -, 页码 112-122

出版社

ELSEVIER
DOI: 10.1016/j.autcon.2018.05.014

关键词

Safety knowledge; Knowledge map; Knowledge flow dynamics; Knowledge management; Tunnel construction project

资金

  1. National Natural Science Foundation of China (NSFC) [51608399, 51678265]
  2. National 12th Five -Year Plan Major Scientific and Technological Issues (NFYPMSTI) [2015BAK33B04]
  3. Research Grants Council of Hong Kong [PolyU 152093/14E]
  4. Fundamental Research Funds for the Central Universities [HUST: cx15-011]

向作者/读者索取更多资源

Safety has always been a persistent problem in the construction industry, particularly for tunnel construction projects due to the inherent uncertainty in geotechnical conditions and the complexity of the tunnel construction process. Literatures and practices highlight the importance of safety knowledge to the construction safety. However, safety knowledge is not always provided in a convenient and timely manner. This paper develops a Knowledge-dynamics Integrated Map (KIM) to visualize safety knowledge flow in tunnel construction safety risk management. The KIM highlights the what, the who, and the why of knowledge flow by portraying its dynamics associated to the working processes. With the use of KIM, the safety knowledge flow barriers are identified so that knowledge flow facilitators can be designed. The KIM has been applied in Wuhan metro project as a blueprint for systematically developing effective safety knowledge management systems.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据