Process, productivity, and economic analyses of BIM based multi-trade prefabrication-A case study

期刊

AUTOMATION IN CONSTRUCTION
卷 89, 期 -, 页码 86-98

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2017.12.035

关键词

Prefabrication; Multi-trade prefabrication; Corridor MEP rack; Productivity; Building information modeling (BIM)

资金

  1. Architecture & Urban Development Research Program - Ministry of Land, Infrastructure and Transport of the Korean Government [17RTRP-B104237-03]
  2. Human Resources Program in Energy Technology of the Korea Institute of Energy Technology Evaluation and Planning (KETEP) - Ministry of Trade, Industry and Energy, Republic of Korea [20174010201320]

向作者/读者索取更多资源

Previous studies yielded contradicting results regarding the benefits of multi-trade prefabrication (MTP) based on building information modeling (BIM). This study investigates the causes of the contradicting results by analyzing the process, productivity, and economic benefits of BIM-based MTP through a case study. The process analysis results indicate that coordinating mechanical, electrical, and plumbing (MEP) systems took longer in MTP than in the conventional method because of the newly added offsite coordination activities. Nevertheless, the overall project duration was reduced because of the parallel execution of MTP and concrete work. The productivity analysis shows that the newly added MTP activities also increased person-hours. However, as the assembly process was repeated, the required person-hours decreased by 40% from that of the initial stage because of the learning effect. The case study revealed that the management of coordination activities and the selection of projects were critical for the successful implementation of BIM-based MTP.