Small scale bio-LNG plant: Comparison of different biogas upgrading techniques

期刊

APPLIED ENERGY
卷 217, 期 -, 页码 328-335

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.apenergy.2018.02.149

关键词

-

向作者/读者索取更多资源

In this paper, a comparison of two different small bio-LNG plants for upgrading and liquefaction have been conducted. In the first configuration liquefaction of the biomethane occurred after the upgrading with conventional processes; in the second configuration, cryogenic upgrading occurred within the liquefaction process, removing CO2 in solid state. For both the two configurations, a two-pressure levels Joule-Brayton reverse cycle, with nitrogen as working fluid, has been considered as refrigeration cycle. The two systems have been simulated and optimized in ASPEN HYSYS, determining the values of the various working parameters which minimized the energy specific consumption. Results showed that a bio-LNG plant with cryogenic upgrading did not require any pre-treatment of raw biogas and reached a very promising energy consumption: 0.61 kWh/Stm(3) of raw biogas processed, equivalent to 1.45 kWh/kg of blo-LNG produced. Bio-LNG plants with standard upgrading techniques required between 0.57 and 0.72 kWh/Stm(3) without considering additions for heating and raw biogas pre-treatment. A sensitivity analysis concerning CH4 content in bio-LNG and intercooling temperature has been accomplished for bio-LNG plants with cryogenic upgrading, proving their impact in specific energy consumption. A standalone bio-LNG plant cryogenic upgrading, with a natural gas internal combustion engine for energy supply, has been studied and briefly discussed. Some solutions for waste heat utilization have been proposed (digesters warming, energy recovery).

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据