4.6 Article

Myopic decision making in energy system decarbonisation pathways. A UK case study

期刊

ENERGY STRATEGY REVIEWS
卷 17, 期 -, 页码 19-26

出版社

ELSEVIER
DOI: 10.1016/j.esr.2017.06.001

关键词

Energy systems decarbonisation; Optimisation energy models; Perfect foresight; Myopic models; TIMES model; Technology diffusion; United Kingdom

资金

  1. UK Engineering and Physical Sciences Research Council (EPSRC) under the Whole Systems Energy Modelling Consortium (WholeSEM) [EP/K039326/1]
  2. Engineering and Physical Sciences Research Council [EP/K039326/1, EP/P022405/1] Funding Source: researchfish
  3. EPSRC [EP/K039326/1, EP/P022405/1] Funding Source: UKRI

向作者/读者索取更多资源

With an application on the UK, this paper shows that myopic planning might result in delayed strategic investments and in considerably higher costs for achieving decarbonisation targets compared to estimates done with perfect foresight optimisation energy models. It also suggests that carbon prices obtained from perfect foresight energy models might be under-estimated. The study was performed using a combination of the standard UK Times Model (UKTM), a perfect foresight, bottom-up, technology-rich cost optimisation energy model, and its myopic foresight version: My-UKTM. This also demonstrates that using perfect foresight optimisation models in tandem with their myopic equivalents can provide valuable indications for policy design. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据