4.7 Article

Priority-sequence of mineral resources' development and utilization based on grey relational analysis method

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ijmst.2016.02.005

关键词

Mineral resources; Development and utilization; Priority-sequence; Grey relational analysis method

资金

  1. key project of the National Natural Science Foundation of China [71273118]

向作者/读者索取更多资源

Generally, the sequence decision of the development and utilization of Chinese mineral resources is based on national and provincial overall plan of the mineral resources. Such plan usually cannot reflect the relative size of the suitability of the development and utilization of mineral resources. To solve the problem, the paper has selected the gift condition, the market condition, the technological condition, socio-economic condition and environmental condition as the starting-points to analyze the influential factors of the priority-sequence of mineral resources' development and utilization. The above 5 conditions are further specified into 9 evaluative indicators to establish an evaluation indicator system. At last, we propose a decision model of the priority sequence based on grey relational analysis method, and figure out the observation objects by the suitability index of development. Finally, the mineral resources of a certain province in China were analyzed as an example. The calculation results indicate that silver (2.0057), coal (1.9955), zinc (1.9442), cement limestone (1.9077), solvent limestone (1.5624) and other minerals in the province are suitable for development and utilization. (C) 2016 Published by Elsevier B.V. on behalf of China University of Mining & Technology.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据