Development of a 4 MW Full-Size Wind-Turbine Test Bench

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/JESTPE.2017.2667399

关键词

Emulation; force; power system faults; pulse width modulation converters; stress; torque; wind energy generation; wind energy integration; Wind energy

资金

  1. EFRE (NRW Ziel 2-Program)

向作者/读者索取更多资源

The in-field validation of wind turbines (WTs) behavior is very time consuming and cost intensive, especially when fault ride-through tests are conducted. Full-size wind-turbine test benches allow a realistic operation of WTs in an artificial environment. Due to the independency of wind and grid conditions, the cost and duration of the test program and certification can be reduced. This paper presents the development of 4 MW full-size wind-turbine test bench following a multiphysics power hardware-in-the-loop concept. Different from other test facilities, the presented test bench utilizes a direct-drive prime-mover concept combined with a nontorqueload (NTL) unit to enable the application of highly dynamic stresses at the rotor hub and additionally a power-electronicsbased grid emulator. Through the measurement results of the test programs conducted on the test bench, the capability of the test bench in replicating the field conditions including voltage dips is demonstrated. In addition, a time consuming efficiency measurement can be performed with the reduced duration on the test bench. This shows another main benefit of the test bench compared to the conventional test method for WTs.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据