4.6 Article

Construction and Commissioning of PAL-XFEL Facility

期刊

APPLIED SCIENCES-BASEL
卷 7, 期 5, 页码 -

出版社

MDPI AG
DOI: 10.3390/app7050479

关键词

FEL; free electron laser; PAL; PAL-XFEL; construction; commissioning; LINAC; beamline

资金

  1. Ministry of Science, ICT and Future Planning, Korea

向作者/读者索取更多资源

The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL), a 0.1-nm hard X-ray free-electron laser (FEL) facility based on a 10-GeV S-band linear accelerator (LINAC), is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was completed by the end of 2014, and the installation of the 10-GeV LINAC and undulators started in January 2015. The installation of the 10-GeV LINAC, together with the undulators and beamlines, was completed by the end of 2015. The commissioning began in April 2016, and the first lasing of the hard X-ray FEL line was achieved on 14 June 2016. The progress of the PAL-XFEL construction and its commission are reported here.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据