期刊
SYMMETRY-BASEL
卷 9, 期 12, 页码 -出版社
MDPI
DOI: 10.3390/sym9120298
关键词
cost estimation; shovel machine; neural network; multivariate regression; hybrid model
Cost estimation is an essential issue in feasibility studies in civil engineering. Many different methods can be applied to modelling costs. These methods can be divided into several main groups: (1) artificial intelligence, (2) statistical methods, and (3) analytical methods. In this paper, the multivariate regression (MVR) method, which is one of the most popular linear models, and the artificial neural network (ANN) method, which is widely applied to solving different prediction problems with a high degree of accuracy, have been combined to provide a cost estimate model for a shovel machine. This hybrid methodology is proposed, taking the advantages of MVR and ANN models in linear and nonlinear modelling, respectively. In the proposed model, the unique advantages of the MVR model in linear modelling are used first to recognize the existing linear structure in data, and, then, the ANN for determining nonlinear patterns in preprocessed data is applied. The results with three indices indicate that the proposed model is efficient and capable of increasing the prediction accuracy.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据