4.3 Article

Sequential Irrigation Scheduling Avoiding Night Irrigation

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)IR.1943-4774.0001178

关键词

Irrigation scheduling; Farmer preferences; Integer programming; LINGO; Earliness; Tardiness

资金

  1. Embassy of the Kingdom of Netherlands, Islamabad, Pakistan [22294]
  2. CGIAR Research Program on Water, Land, and Ecosystems (WLE)

向作者/读者索取更多资源

The sequential irrigation scheduling problem is one where a set of irrigation jobs have to be scheduled sequentially. In this paper, an integer program is presented to solve this problem. The objective function is a dual-goal function that avoids night irrigation and minimizes earliness or tardiness, with the former objective taking priority over the latter. A scheduled start time cost function is introduced and is user defined to reflect the behavior and preferences (and aversions) of farmers. In this paper, the scheduled start time cost function is a piecewise linear function and uses techniques from operations research. It is linearized using the disjunctive method. The integer program is implemented in a general-purpose solver and applied to a 16-job problem to demonstrate that a schedule can be prepared that avoids night irrigation and minimizes earliness and tardiness. There is a trade-off between avoiding night irrigation and earliness and tardiness compared to earlier models that minimize only earliness and tardiness. However, the increase in earliness and tardiness for the example presented is modest. (C) 2017 American Society of Civil Engineers.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.3
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据