4.6 Article

Evolutionary Multiobjective Blocking Lot-Streaming Flow Shop Scheduling With Machine Breakdowns

期刊

IEEE TRANSACTIONS ON CYBERNETICS
卷 49, 期 1, 页码 184-197

出版社

IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
DOI: 10.1109/TCYB.2017.2771213

关键词

Genetic algorithm; lot-streaming; machine breakdown; rescheduling; robustness and stability criteria

资金

  1. National Natural Science Foundation of China [61773384, 61673404, 61375067, 61374043, 61473299, 71533001, 61773192, 61503170, 61603169, 61773246, 61403155]
  2. Joint Research Fund for Overseas Chinese
  3. Hong Kong and Macau Scholars of National Natural Science Foundation of China [61428302]
  4. Shangdong Province Higher Educational Science and Technology Program [J14LN28, J17KZ005]
  5. Natural Science Foundation of Shandong Province [ZR2017BF039, ZR2016FL13]

向作者/读者索取更多资源

In various flow shop scheduling problems, it is very common that a machine suffers from breakdowns. Under this situation, a robust and stable suboptimal scheduling solution is of more practical interest than a global optimal solution that is sensitive to environmental changes. However, blocking lot-streaming flow shop (BLSFS) scheduling problems with machine breakdowns have not yet been well studied up to date. This paper presents, for the first time, a multiobjective model of the above problem including robustness and stability criteria. Based on this model, an evolutionary multiobjective robust scheduling algorithm is suggested, in which solutions obtained by a variant of single-objective heuristic are incorporated into population initialization and two novel crossover operators are proposed to take advantage of nondominated solutions. In addition, a rescheduling strategy based on the local search is presented to further reduce the negative influence resulted from machine breakdowns. The proposed algorithm is applied to 22 test sets, and compared with the state-of-the-art algorithms without machine breakdowns. Our empirical results demonstrate that the proposed algorithm can effectively tackle BLSFS scheduling problems in the presence of machine breakdowns by obtaining scheduling strategies that are robust and stable.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据