4.7 Article

Non-linear modeling of yield stress increase due to SCC structural build-up at rest

期刊

CEMENT AND CONCRETE RESEARCH
卷 92, 期 -, 页码 92-97

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.cemconres.2016.11.020

关键词

Yield stress; Structural build-up; Thixotropy

向作者/读者索取更多资源

It is commonly considered that the yield stress of SCC increases linearly at rest. This increase is due to the SCC structural build-up. This behavior can be explained by the cement particle nucleation at the contact points. During the first dozens of minutes, the cement particle nucleation induces a linear increase of the yield stress in time. However, recent studies have shown that the trend of the yield stress increase becomes non-linear when considering a longer time (before the setting time). This study aims to provide a theoretical frame to describe this non-linear increase. The proposed model tends toward the linear model during the first dozens of minutes and follows the observed exponential law for a longer resting time. The discrepancy with the linear model is explained by two phenomena: an increase in the solid volume fraction and a decrease in the packing fraction due to cement particle nucleation. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据