4.6 Article

Leaderless and leader-following consensus of multi-agent chaotic systems with unknown time delays and switching topologies

期刊

NONLINEAR ANALYSIS-HYBRID SYSTEMS
卷 24, 期 -, 页码 115-131

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.nahs.2016.11.007

关键词

Synchronization of multi-agent system; Chaotic systems; Time delays; Switching topologies; Directed intermittent communications

资金

  1. Major State Basic Research Development Program 973 [2012CB215202, 2014C8249200]
  2. National Natural Science Foundation of China [61203076, 61134001]
  3. Basic and Frontier Research Project of Chongqing [cstc2013jcyjA70006, cstc2015jcyjA40038]
  4. Natural Science Foundation of Tianjin City [13JCQNJC03500]

向作者/读者索取更多资源

In this paper the distributed consensus problem for a class of multi-agent chaotic systems with unknown time delays under switching topologies and directed intermittent communications is investigated. Each agent is modeled as a general nonlinear system including many chaotic systems with or without time delays. Based on the Lyapunov stability theory and graph theory, some sufficient conditions guarantee the exponential convergence. A graph-dependent Lyapunov proof provides the definite relationship among the bound of unknown time delays, the admissible communication rate and each possible topology duration. Moreover, the relationship reveals that these parameters have impacts on both the convergence speed and control cost. The case with leader-following communication graph is also addressed. Finally, simulation results verify the effectiveness of the proposed method. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据