Scheduling resource-constrained projects with a flexible project structure

期刊

EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
卷 246, 期 2, 页码 379-391

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.ejor.2015.05.003

关键词

Project scheduling; Genetic algorithms; RCPSP; Flexible projects

资金

  1. German Research Foundation (DFG) [CRC 871]

向作者/读者索取更多资源

In projects with a flexible project structure, the activities that must be scheduled are not completely known in advance. Scheduling such projects includes deciding whether to perform particular activities. This decision also affects precedence constraints among the implemented activities. However, established model formulations and solution approaches for the resource-constrained project scheduling problem (RCPSP) assume that the project structure is provided in advance. In this paper, the traditional RCPSP is extended using a highly general model-endogenous decision on this flexible project structure. This extension is illustrated using the example of the aircraft turnaround process at airports. We present a genetic algorithm to solve this type of scheduling problem and evaluate it in an extensive numerical study. (C) 2015 Elsevier B.V. and Association of European Operational Research Societies (EURO) within the International Federation of Operational Research Societies (IFORS). All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据