4.2 Article

Scheduling optimisation of a real flexible job shop including fixture availability and preventive maintenance

期刊

出版社

INDERSCIENCE ENTERPRISES LTD
DOI: 10.1504/EJIE.2015.067451

关键词

production planning; flexible job shop scheduling problem; FJSP; mathematical optimisation; dynamic scheduling; preventive maintenance; fixture availability; time-indexed formulation; objective weights; time horizon

资金

  1. GKN Aerospace
  2. Swedish Research Council
  3. NFFP (Swedish National Aeronautics Research Programme)
  4. VINNOVA through Chalmers Transport Area of Advance

向作者/读者索取更多资源

The multitask cell at GKN Aerospace Sweden is a flexible job shop containing ten resources aimed at being flexible with regard to product mix and processing types. We present a time-indexed formulation of the problem of optimally scheduling the planned jobs on the resources, also considering a limited availability of fixtures as well as required preventive maintenance activities. The objective is to minimise a weighted sum of the completion times and tardiness for the jobs, where the tardiness weight for a given job is a non-increasing function of its due date. We propose a fast iterative approach to finding a suitable value of the length of the time horizon that needs to be set for the time-indexed formulation and which considerably influences the computation time. Computational results show that the method developed is able to produce optimal, or near-optimal, schedules for real data instances within an acceptable practical time frame.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.2
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据