期刊
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT
卷 182, 期 -, 页码 418-424出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.proeng.2017.03.126
关键词
Michalowo commune; 14 turbines; criteria; decision support; Bord ranking methods; optimum variant; objective result; sustained technologies
资金
- Ministry of Science and Higher Education from the funds earmarked for the public understanding of science initiatives [712/P-DUN/2016]
The paper presents a discussion on different methods of multi-criteria analysis and different rules of proceedings that have to be taken into account when making a decision regarding the location of a wind farm in the NE Poland. In the study, six multi-criteria analyses were discussed taking into account the main criteria on which they are based: utility functions (MAUT, AHP, DEMATEL), relationships outranking (ELECTRE, PROMETHEE), and decision support (Borda ranking methods). (C) 2016 The Authors. Published by Elsevier Ltd.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据