4.7 Article

On multi-item economic lot-sizing with remanufacturing and uncapacitated production

期刊

APPLIED MATHEMATICAL MODELLING
卷 50, 期 -, 页码 772-780

出版社

ELSEVIER SCIENCE INC
DOI: 10.1016/j.apm.2016.10.037

关键词

Inventory; Lot-sizing with remanufacturing; Mixed integer programming; Multi-item; Reverse logistics

资金

  1. Coordination for the Improvement of Higher Education Personnel (CAPES), Brazil

向作者/读者索取更多资源

In this study, we consider the multi-item economic lot-sizing problem with remanufacturing and uncapacitated production. By observing that the problem comprises several independent single-item problems, we show how very high quality feasible solutions and bounds can be obtained by solving each item separately using an effective recently proposed approach. Computational experiments demonstrate that our approach improves the best known feasible solutions and lower bounds for all the available instances. In addition, we show that 86 instances can be solved to optimality and the remaining open gap is below 0.5% for almost all the unsolved instances. (C) 2016 Elsevier Inc. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据