4.7 Article

Work packaging with BIM

期刊

AUTOMATION IN CONSTRUCTION
卷 83, 期 -, 页码 121-133

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.autcon.2017.08.030

关键词

Work packaging; BIM; Design structure matrix; Domain mapping matrix

向作者/读者索取更多资源

The fact that a large portion of the work in construction projects is usually carried out by different subcontractors, makes an effective work packaging process crucial for the subsequent execution planning. However, the definition of optimal work packages is currently challenging and time consuming. A method was developed to allow the work packaging process to be carried out in a more accurate and efficient way, using data from Building Information Models (BIM). This method is based on a bottom-up approach that can take into account relations between specific components, and the consequent interruptions that will occur in the construction processes. The method incorporates BIM data in Design Structure Matrices and Domain Mapping Matrices to automatically generate a list of proposed work packages with minimal interfaces. An application of the method in a case study demonstrated that it can accelerate the work packaging process, and allow alternative solutions to be explored at an early stage in the project.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据