4.7 Article

An optimization algorithm for integrated remanufacturing production planning and scheduling system

期刊

CHAOS SOLITONS & FRACTALS
卷 105, 期 -, 页码 69-76

出版社

PERGAMON-ELSEVIER SCIENCE LTD
DOI: 10.1016/j.chaos.2017.10.012

关键词

Remanufacturing; Production planning; Scheduling; Birandom programing; Hybrid intelligent algorithm

向作者/读者索取更多资源

It is known that production planning and scheduling are mutual influence and restriction. In this paper, we aim to obtain the minimum remanufacturing time of recycling parts by use of birandom variables and further optimize an integrated remanufacturing production planning and scheduling system under uncertain conditions. An integrated production planning and scheduling optimization model with birandom variable restraints is firstly established. Then we develop a hybrid intelligent algorithm including random simulation technique, neural network, and genetic algorithms to optimize an integrated remanufacturing production planning and scheduling system. Furthermore, we generate a random variable samples matrix through random simulation technique and a trained neural network is embedded into genetic algorithm. Finally, this hybrid intelligent algorithm is applied to optimize an integrated remanufacturing production planning and scheduling system through a case study. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据