4.7 Article

Multi-objective probabilistic optimum monitoring planning considering fatigue damage detection, maintenance, reliability, service life and cost

期刊

出版社

SPRINGER
DOI: 10.1007/s00158-017-1849-3

关键词

Damage detection; Fatigue; Maintenance; Probability; Multi-objective optimization; Reliability; Service life; Structural health monitoring

资金

  1. National Science Foundation (NSF) [CMMI-1537926]
  2. Commonwealth of Pennsylvania, Department of Community and Economic Development, through the Pennsylvania Infrastructure Technology Alliance (PITA)
  3. U.S. Federal Highway Administration (FHWA) [DTFH61-07-H-00040]
  4. U.S. Office of Naval Research (ONR) [N00014-08-1-0188, N00014-12-1-0023, N00014-16-1-2299]
  5. National Aeronautics and Space Administration (NASA) [NNX10AJ20G]
  6. Regional Development Research Program by Ministry of Land, Infrastructure and Transport of Korean government Award [16RDRP-B076564-03]

向作者/读者索取更多资源

Effective and efficient service life management is essential for a deteriorating structure to ensure its structural safety and extend its service life. The difficulties encountered in the service life management are due to the uncertainties associated with detecting and identifying structural damages, and assessing and predicting the structural performance. To reduce these uncertainties, continuous long-term structural health monitoring (SHM) can be employed. However, a rational and practical SHM planning is required to simultaneously maximize the accuracy, efficiency, and cost-effectiveness in service life management. This paper proposes a probabilistic optimum SHM planning based on five objectives to be simultaneously optimized: minimizing the expected damage detection delay, minimizing the expected maintenance delay, maximizing the damage detection time-based reliability index, maximizing the expected service life extension, and minimizing the expected life-cycle cost. The formulations of the five objectives are based on the probabilistic fatigue damage assessment. The monitoring plannings associated with both a single- and a multi-objective probabilistic optimization process (MOPOP) are investigated. For efficient decision making in identifying the essential objectives and selecting a well-balanced solution among the Pareto optimal solutions, the degree of conflict among objectives and objective weights are estimated. The novel approach proposed in this paper accounts for the interdependencies among the five objectives considered and demonstrates the role of the optimum SHM planning in service life management of deteriorating structures. The proposed MOPOP SHM planning is applied to the hull structure of a ship subjected to fatigue.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据