A study of postponed replacement in a delay time model

期刊

RELIABILITY ENGINEERING & SYSTEM SAFETY
卷 168, 期 -, 页码 70-79

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.ress.2017.04.006

关键词

Opportunistic maintenance; Delay time modelling; Imperfect inspection; False positive; False negative; Postponed replacement; Manufacturing

资金

  1. Spanish Ministry of Economy and Competitiveness [MTM2015-63978-P]
  2. CNPq (Brazilian Research Council)

向作者/读者索取更多资源

We develop a delay time model for a one component system with postponed replacement to analyze situations in which maintenance might not be executed immediately upon discovery of a defect in the system. Reasons for postponement are numerous: to avoid production disruption or unnecessary or ineffective replacement; to prepare for replacement; to extend component life; to wait for an opportunity. This paper explores conditions that make postponement cost-effective. We are interested in modelling the reality in which a maintainer either prioritizes functional continuity or is not confident of the inspection test indicating a defective state. In some cases more frequent inspection and a longer time limit for postponement are recommended to take advantage of maintenance opportunities, characterized by their low cost, arising after a positive inspection. However, when the cost of failure increases, a significant reduction in the time limit of postponement interval is observed. The examples reveal that both the time to defect arrival and delay time have a significant effect upon the cost-effectiveness of maintenance at the limit of postponement. Also, more simply, we fmd that opportunities must occur frequently enough and inspection should be a high quality procedure to risk postponement. (C) 2017 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据