3.8 Article

e-Tendering readiness in construction: the posterior model

期刊

CONSTRUCTION INNOVATION-ENGLAND
卷 18, 期 2, 页码 -

出版社

EMERALD GROUP PUBLISHING LTD
DOI: 10.1108/CI-06-2017-0051

关键词

SEM; Construction management; Readiness; e-Procurement; e-Organisation; e-Tendering

向作者/读者索取更多资源

Purpose The purpose of this paper is to varied a conceptual model for e-Tendering readiness in any construction organisation prior of implementing e-Tendering system. Design/methodology/approach Based on conceptual model called e-Tendering readiness model (e-TRM), this paper empirically examines the e-TRM's interactions and causal relationships between e-Tendering constructs and e-Tendering readiness. The paper uses the structural equation modelling technique to test the hypothesised positive inter-relationships. A questionnaire survey is conducted for respondents of construction organisations in Saudi Arabia to understand their current e-Tendering readiness and importance of e-Tendering variables. Findings Supported by empirical evidence, this paper recognised that three out of nine constructs have direct influences on the e-Tendering readiness. However, one of the constructs, which is for the first time hypothesised and tested has the most effect. Research limitations/implications Ultimately, the empirical test for the e-TRM is conducted in certain case (Saudi Arabia); however, the e-TRM needs to be tested in other case area for more verification. Practical implications The study findings update previous information technology/information system models in construction by adding this tested model to the research literature on traditional and electronic tendering and the body of knowledge in the construction industry. Originality/value The service providers construct is proposed and tested for the first time, which is necessary to support the successful e-Tendering implementation.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据