Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders

期刊

PRODUCTION PLANNING & CONTROL
卷 28, 期 13, 页码 1081-1092

出版社

TAYLOR & FRANCIS LTD
DOI: 10.1080/09537287.2017.1333647

关键词

Change-orders; public sector; cost performance; infrastructure; procurement

资金

  1. Australian Research Council [DP160102882]

向作者/读者索取更多资源

The cost performance of a wide range of public sector infrastructure projects completed by a contractor are analysed and discussed. Change-orders after a contract to construct an asset was signed were, on average, found to contribute to a 23.75% increase in project costs. A positive association between an increase in change orders and the contractor's margin were identified. Taxpayers pay for this additional cost, while those charged with constructing assets are rewarded with an increase in their margins. As the public sector embraces an era of digitisation, there is a need to improve the integration of design and construction activities and engender collaboration to ensure assets can be delivered cost effectively and future-proofed. The research paper provides empirical evidence for the public sector to re-consider the processes that are used to deliver their infrastructure assets so as to reduce the propensity for cost overruns and enable future-proofing to occur.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.5
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据