3.8 Proceedings Paper

Reducing Work Overtime in Production Line by Comparing Two Heuristic Line Balancing Method: Case Study of Beam Comp Stering Hanger at PT. Metindo Era Sakti

出版社

IOP PUBLISHING LTD
DOI: 10.1088/1757-899X/453/1/012049

关键词

-

向作者/读者索取更多资源

Production line is a set of sequential operation that support refinery process product from raw material to end process into finish product. However, due to the operations have different time process to finish an item/part, it caused unbalance processing time in certain work station in a production line. This problem increases overtime to work station with heavy load tasks, in the contrary to work station with low load tasks results idle workers. Overtime is definitely cost to organization. PT. Metindo Era Sakti has overtime as their issue. To balance the process time in work stations, line balancing method is one of option to the problem. Line Balancing uses to reduce overtime by increasing production line efficiency, reducing delay time, and decreasing worker idle time [8]. By using Rank Positioned Weight (RPW) and Largest Candidate Rules (LCR) and comparing those methods was proven that production line efficiency increased by 85,63%, delay time decreased by 14,37%, and reduced idle time by 3,77 minutes. Therefore, while reducing overtime, PT. Metindo Era Sakti enable to minimize overtime cost by Rp. 4.092.000 each year.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据