4.6 Article

Transmission expansion planning using multivariate interpolation

期刊

ELECTRIC POWER SYSTEMS RESEARCH
卷 126, 期 -, 页码 87-99

出版社

ELSEVIER SCIENCE SA
DOI: 10.1016/j.epsr.2015.03.031

关键词

Transmission expansion planning; Multivariate interpolation; BPSO; N-1 security criterion; Dynamic planning; Optimization

向作者/读者索取更多资源

The total cost of the transmission expansion planning (TEP) problem consists of investment and operation costs. The former is the required capital investment cost for new circuits throughout the network, and the latter is the cost of optimal generation dispatch to meet the demand at each hour. Traditionally, due to computational limits and long-term planning, the operation cost is not computed for hourly demand in the TEP problem. It is typically computed for the peak demand occurring during each year. In addition, the price of fuel used in the operation problem is considered fixed rather than variable overtime. In this paper, we use a multivariate interpolation method to compute the operation cost for the TEP problem in which the demand changes from hour to hour and the fuel price from day to day. A binary particle swarm optimization (BPSO) is proposed to solve the TEP problem. We apply our method to the Garver's 6-bus system and the IEEE 24-bus system for a planning horizon of ten years. By using the multivariate interpolation, the computational time of the solving algorithm is reduced. We compare our method with traditional methods based on the total cost of the obtained expansion plans. Experimental results show that the proposed method is an enhancement to solving the multi-year security-constrained TEP problem. (C) 2015 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据