4.7 Article

Optimal PMU placement for power system observability using Taguchi binary bat algorithm

期刊

MEASUREMENT
卷 95, 期 -, 页码 8-20

出版社

ELSEVIER SCI LTD
DOI: 10.1016/j.measurement.2016.09.031

关键词

Binary bat algorithm; Observability; Optimal placement; Phasor measurement unit; Taguchi method

向作者/读者索取更多资源

Phasor measurement units (PMUs) are considered as a promising tool in wide area monitoring, protection, and control of power system networks. In this paper, a novel technique based on Taguchi binary bat algorithm (TBBA) is proposed to determine the optimal number and placement locations of PMUs such that power system is completely observable. The proposed TBBA combines the systematic reasoning ability of the Taguchi method with the traditional binary bat algorithm thereby enhances the initial population, and subsequently, improves the computational efficacy of the solution. The effectiveness of the proposed method is demonstrated on a number of power system test systems under different operating conditions. Results thus obtained are compared with the existing techniques published in the literature. From the results it has been found that the proposed technique not only yields multiple global optimal solutions in single experimental run but also provides solution with lesser computational time. Further, the proposed technique provides similar or better optimal solutions in comparison with the other techniques proposed in the literature. (C) 2016 Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据