2ND INTERNATIONAL CONFERENCE ON ENERGY AND POWER (ICEP2018)
卷 160, 期 -, 页码 277-284出版社
ELSEVIER SCIENCE BV
DOI: 10.1016/j.egypro.2019.02.147
关键词
Photovoltaic; Lifecycle energy; Biogas plant; Rural; Cost
The work aimed in developing new design of plants and helps improving the efficiency of the plants. This study represents a complete analysis of energy and cost of selected biogas plants and solar PV systems. Data were collected from 20 small scale biogas plants and 20 solar PV systems from 3 sub-Districts of Tangail Districts and 1 sub-District of Rajshahi, Bangladesh. Often three sizes of biogas plants- small (2.4 m(3)), medium (3.2 m(3)) and large (4.8 m(3)) were found and five capacities of 40, 50, 65, 75 and 85 watt-peak solar PV systems were found in the sampled areas. It was found that the energy payback time of biogas plants were 2 years for 2.4m(3), 1.66 years for 3.2 m(3) and 2.33 years for 4.2 m(3) plant. While the energy payback time for solar PV systems were found 6.53 to 7.57 years depending on system capacity. Cost payback period of biogas plants were 3.4 years for 2.4 m(3), 2 years for 3.2 m(3) and 2.5 years for 4.2 m(3) while cost payback period for solar PV systems were found 2.55 to 4.03 years. The cost per unit biogas was found 9.8 BDT (Bangladeshi Taka) for cow dung based plants and 6.9 BDT for poultry waste based plants while the cost of per unit solar electricity was found average 8.2 BDT. (C) 2019 The Authors. Published by Elsevier Ltd.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据