期刊
RESOURCES POLICY
卷 62, 期 -, 页码 184-192出版社
ELSEVIER SCI LTD
DOI: 10.1016/j.resourpol.2019.03.002
关键词
In mine recovery; Underground mining; Open stoping; Mathematical modelling
资金
- CSIRO
- Mining3
Conventional underground mining methods rely on extracting a large amount of ore rock from its original place and moving it to surface. An innovative idea of in mine recovery (IMR) has been recently presented by Mining3 to minimise rock movements by recovering low grade ore deposit using in-situ leaching concept. In this paper, the added value of the hybridisation of IMR and a conventional mining method is evaluated through a strategic resource-constrained planning model. The proposed integer programming model simultaneously considers orebody characteristics, mining and leaching capacities, processing requirements and associated mining and processing costs. Results of solving the proposed model for a small-scale orebody, demonstrate that integrating IMR into a conventional mining operation can significantly improve the net present values of the project by recovering the low grade part of the orebody usually left as the waste rock in conventional mining methods.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据