4.8 Article

Enabling fast charging - Infrastructure and economic considerations

期刊

JOURNAL OF POWER SOURCES
卷 367, 期 -, 页码 237-249

出版社

ELSEVIER SCIENCE BV
DOI: 10.1016/j.jpowsour.2017.06.079

关键词

Extreme fast charging (XFC); Electric vehicle infrastructure; Battery electric vehicles; Demand charges; Total cost of ownership; Economics

资金

  1. US Department of Energy, Office of Vehicle Technologies [DE-AC02-06CH11357, DE-DE-AC07-05ID14517, DE-AC36-08GO28308]

向作者/读者索取更多资源

The ability to charge battery electric vehicles (BEVs) on a time scale that is on par with the time to fuel an internal combustion engine vehicle (ICEV) would remove a significant barrier to the adoption of BEVs. However, for viability, fast charging at this time scale needs to also occur at a price that is acceptable to consumers. Therefore, the cost drivers for both BEV owners and charging station providers are analyzed. In addition, key infrastructure considerations are examined, including grid stability and delivery of power, the design of fast charging stations and the design and use of electric vehicle service equipment. Each of these aspects have technical barriers that need to be addressed, and are directly linked to economic impacts to use and implementation. This discussion focuses on both the economic and infrastructure issues which exist and need to be addressed for the effective implementation of fast charging at 400 kW and above. In so doing, it has been found that there is a distinct need to effectively manage the intermittent, high power demand of fast charging, strategically plan infrastructure corridors, and to further understand the cost of operation of charging infrastructure and BEVs. (C) 2017 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据