System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)ME.1943-5479.0000472

关键词

Project risk management; Schedule delay; Infrastructure project; System dynamics

资金

  1. National Natural Science Foundation of China [71272088]
  2. Fundamental Research Funds for the Central Universities [26816WCX01]

向作者/读者索取更多资源

Effective risk management is critical to the success of infrastructure projects. Although several studies in the literature have focused on various aspects of infrastructure project risk management, limited efforts have investigated the overall dynamics of infrastructure project risks and how dynamic risk interactions can affect a project schedule. This study, therefore, takes a holistic view to investigate the effects of dynamic risk interactions on a schedule delay in infrastructure projects. First, major risks that can cause a schedule delay in infrastructure projects are identified through a review of related literature and questionnaire survey. Second, the interactions among main variables related to infrastructure schedule risks are analyzed using causal loop diagrams. Afterward, a system dynamics (SD) model for the investigation of risk effects on a project schedule is developed based on the causal loop diagrams and the underlying relations among the variables. Finally, the model is applied and simulations are carried out. The findings show clearly that dynamic interactions among diverse infrastructure project risks are critical in evaluating risk effects on a schedule delay. Because of the complex and dynamic behavior of the studied system, compared with previous studies in which risk impacts are investigated separately, risk effects on an infrastructure project schedule delay would be larger when major risks are collectively considered. The SD model can be used as a basis for simulating various risk effects on a project schedule to explore the optimum measures to prevent such risks in advance. (C) 2016 American Society of Civil Engineers.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据