4.6 Article

Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction Projects

期刊

出版社

ASCE-AMER SOC CIVIL ENGINEERS
DOI: 10.1061/(ASCE)ME.1943-5479.0000488

关键词

Engineering and construction; Interface management; Project complexity; Project management

资金

  1. Construction Industry Institute

向作者/读者索取更多资源

Recently, formal approaches to interface management (IM) have been adopted in a number of large-scale engineering and construction (E&C) projects. However, understanding of the role and performance of IM practices in E&C projects is quite limited today. Given this circumstance, this paper attempts to understand the effectiveness of IM practices in E&C projects from the perspective of dealing with project complexity. To fulfill the objective, data on project complexity and IM practices were collected from 45 large-scale E&C projects and analyzed using quantitative analysis methods such as principal component analysis and linear regression. The data analysis revealed that current formal IM practices employed in E&C projects are effective for mitigating the adverse impact of project complexity originating from uncertainty in scope and communication and large numbers of stakeholders; however, they are not as effective for dealing with project complexity originating from large numbers of engineered items. These results provide insights into the direction of future advancement in IM techniques for large-scale E&C projects.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据