3.8 Proceedings Paper

An integrated production inventory routing problem for multi perishable products with fuzzy demands and time windows

期刊

IFAC PAPERSONLINE
卷 52, 期 13, 页码 523-528

出版社

ELSEVIER
DOI: 10.1016/j.ifacol.2019.11.123

关键词

Production inventory routing; Perishable product; Fuzzy system; Discrete discount function

向作者/读者索取更多资源

This paper presents an integrated production inventory routing problem with a mixed integer linear programming (MILP) model that remarks a multi-product, multi-period with heterogeneous fleets and time windows in a distribution network. In particular, this research differs because of the limited lifetime of products, demand uncertainty and integration of production-inventory-routing. Two fuzzy approaches define the uncertainty in the demand of retailers. The objective of the proposed model is to maximize the total profit, which equals the selling revenue subtract the aggregation of the holding, production, transportation and driver wage costs. Randomly generated instances are used to validate the effectiveness and the intricacy of the model, which is solved by the linear programming solver CPLEX.(C) 2019, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据