4.7 Article

Effects of check dams on runoff characteristics along gully reaches, the case of Northern Ethiopia

期刊

JOURNAL OF HYDROLOGY
卷 545, 期 -, 页码 299-309

出版社

ELSEVIER
DOI: 10.1016/j.jhydrol.2016.12.019

关键词

Gully control; Lag time; Northern Ethiopia; Peak runoff discharge; Runoff volume; Tekeze basin

资金

  1. Ghent University (Belgium) through its BOF (Special Research Fund)
  2. RIP-MU (VLIR) project

向作者/读者索取更多资源

In the Highlands of Northern Ethiopia soil and water conservation (SWC) practices, including construction of check dams in gullies, have been widely implemented for the last three decades. Despite this extensive installation of check dams, their effects on runoff response are not well understood as compared to those of other SWC practices. Hence, this study examines the effects of check dams on runoff response in gully channels. 90 degree V-notch weirs were installed to measure a wide range of runoff discharges at the upper and lower sections of five gully reaches: two channel cut in sandstone (a gully with check dams and vegetation (SCV) and an untreated gully (S)) and three cut in limestone (an untreated gully (L), a gully with check dams but no vegetation (LC) and a gully with check dams and vegetation (LCV)). Automatic sensors were installed to monitor runoff depth during two rainy seasons (29/08/14 - 17/09/14 and 24/7/15 - 14/09/15). All runoff characteristics at the lower section of each gully reaches were calculated for a gully reaches length of 50 m. In the sandstone area, the results show longer lag times of runoff to reach the lower section of the channel reach in the treated gully (SCV) compared to the untreated gully: difference in time lag equal lag to production of runoff equals 51% for runoff initiation, 61% for peak runoff and 44% for runoff end. An increase of hydraulic roughness by check dams and water transmission losses in deposited sediments are responsible for the delay of runoff to reach the lower part of the gully channels. In the limestone area, different time lags were recorded in different gully reaches regardless of the treatment effects (lag to runoff initiation, lag to peak flow and lag to runoff end were larger at LC, L and LCV, respectively). The reduction of peak runoff discharge between the upper and lower gully sections was larger in the gullies with check dam and vegetation (8-17%) than in gullies without treatment (5-6%). Reduction of runoff volume between these 2 gully sections was also larger in treated gullies than in untreated gullies: i.e. 18%, 9% and 8% in SCV, LCV and LC, respectively while it was only 4% in S and 6% in L. This study shows that the implementation of check dams combined with vegetation reduced peak flow discharge and runoff volume as large sections of runoff infiltrated in the sediments deposited behind the check dams. As gully check dams are implemented in a large areas of the North Ethiopia Highlands, this contributes to groundwater recharge and increased river base flow. (C) 2016 Elsevier B.V. All rights reserved.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.7
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据