6D BIM-Terminal: Missing Link for the design of CO2-neutral buildings

出版社

IOP PUBLISHING LTD
DOI: 10.1088/1755-1315/323/1/012104

关键词

-

资金

  1. BMVIT Programme 'Stadt der Zukunft' (City of the Future)

向作者/读者索取更多资源

By 2050, the building sector has to become nearly CO2-neutral in order to achieve the climate protection targets of the Paris agreement. This tremendous challenge can only be met by taking the carbon neutrality into consideration from the early stages of the planning processes. The overall aim of the project is to provide a life cycle analysis throughout the entire planning and construction process of a building with a special focus on CO2-neutrality. To this end, Building Information Modeling (BIM) is an appropriate method. The project aims to close the gap between specialist consultants and BIM applications. For that, relevant data for cost estimation, scheduling construction planning and management or sustainable building aspects, shall be added automatically to BIM elements. This data exchange shall be carried out using open BIM and IFC interface according to ONORM A6241-2 via a central platform, the 6D BIM Terminal. For more complex calculations the respective specialist planning software shall be made ready to exchange data in IFC format. Thus, life cycle analyses and life cycle cost assessment, as well as specifications for tender, can be performed on the basis of the building model. The expected results of the project are as follows: The prototype of a 6D BIM Terminal Interface for existing specialist planning software to the 6D BIM Terminal Guidelines for planners List with the required properties (PSet's)

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据