3.8 Article

Bottlenecks of hydropower development in Central Asia: Failure of aid coordination by development banks

期刊

HYDROLOGICAL RESEARCH LETTERS
卷 14, 期 1, 页码 29-33

出版社

JSHWR, JAGH, JAHS, JSPH
DOI: 10.3178/hrl.14.29

关键词

aid coordination; Central Asia; hydropower; Rogun Dam; Tajikistan; transboundary trade of electricity

资金

  1. JSPS KAKENHI [JP17K18578]
  2. Sumitomo Foundation
  3. 21st Century Culture and Academic Foundation
  4. University of Tokyo (Graduate School of Frontier Science, Department of International Studies)

向作者/读者索取更多资源

The Central Asian countries have abundant but unevenly distributed natural resources including water. The Central Asia Power System (CAPS) project initiated by the Asian Development Bank and the Central Asia-South Asia Electricity Transmission and Trade Project (CASA-1000) initiated by the World Bank are planned to catalyze trade of electricity in this region. However, the existing surplus of the hydropower generation capacity of Tajikistan in summer may only meet the anticipated power demand by one project. The CAPS project (to be completed in 2023) may monopolize the surplus in Tajikistan and the CASA-1000 project (to be completed later) may suffer from the shortage of electricity. It stems from the failure of aid coordination between the Asian Development Bank and the World Bank. This study reveals (a) how the assumptions made for the CAPS and CASA-1000 projects differ, and (b) possible causes of the failed aid coordination. It turned out that (a) the officer in a development bank who is in charge of project development has little motivation to submit his or her project to aid coordination, (b) only geographic demarcation between two projects was discussed and agreed upon in the aid coordination, and (c) no technical detail of these projects was discussed in the aid coordination.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据