A MODEL OF DISCRETE ZERO-SUM TWO-PERSON MATRIX GAMES WITH GREY NUMBERS TO SOLVE DISPUTE RESOLUTION PROBLEMS IN CONSTRUCTION

期刊

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
卷 23, 期 6, 页码 824-835

出版社

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/13923730.2017.1323005

关键词

MCDM; construction delay; dispute resolution; game theory; ADR; grey number

向作者/读者索取更多资源

Conflict between parties is a common issue in construction projects. In the present article, the conflicts between contractor and employer in delayed Design-Bid-Build projects have been studied. Defining a case study, a dispute resolution method has been proposed. This case has been considered as a MCDM problem. This problem has been assumed as a discrete zero-sum two-person matrix game with grey numbers. Among the four alternatives available for contractor and employer in the proposed case study, termination is the last alternative that decision makers choose. Based on different risk values, authors determined the optimal solution for both parties. This article integrates some linguistic criteria together with time and cost, providing the better conditions to avoid lengthy bargaining.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据