HYBRID SWARA-COPRAS METHOD FOR RISK ASSESSMENT IN DEEP FOUNDATION EXCAVATION PROJECT: AN IRANIAN CASE STUDY

期刊

JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
卷 23, 期 4, 页码 524-532

出版社

VILNIUS GEDIMINAS TECH UNIV
DOI: 10.3846/13923730.2017.1281842

关键词

risk assessment; deep foundation; excavation project; COPRAS; SWARA; Shiraz

资金

  1. PDRU (Malaysia) [PY/2016/07174]

向作者/读者索取更多资源

Existing risks in deep foundation excavation projects is a major issue in developing cities. With the rapid increase in the number of various deep foundation and excavation projects in big cities of Iran, many accidents related to deep excavation have been reported every year. These accidents affected delay and increased cost of project implementation. Therefore identification and assessment of risks of these accidents is essential. The aim of the research was to develop a framework to overcome limitations of previous approaches to assess of risks in excavation projects. According to the complexity of a problem and the inherent uncertainty, the framework adopted SWARA (Step-wise Weight Assessment Ratio Analysis) and COPRAS (COmplex PRoportional ASsessment) methods through introducing new criteria for risk assessment. Data was collected through interview, a literature review and a questionnaire survey distributed to excavation project experts. A case study of deep foundation excavation in Shiraz was presented. The results have shown that the risks involving construction safety, unfavourable geological conditions, shortage of managerial experience, incomplete emergency plan and subsidence of ground are the most significant risks excavation projects in Shiraz. The proposed framework and the obtained results can help stakeholders of excavation projects in developing countries better to manage project risks.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

4.6
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据