期刊
BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT
卷 17, 期 1, 页码 -出版社
ASSOC BRASILEIRA ENGENHARIA PRODUCAO-ABEPRO
DOI: 10.14488/BJOPM.2020.007
关键词
Earned Value Indicator; Critical Success Factors; Construction Performance; Project Management
Goal: The main objective of this study is to analyze the benefits and the critical success factors (CSF) to use of Earned Value Management (EVM) in the construction projects. Design / Methodology / Approach: The research methodology was quantitative approach with statistical analysis of questionnaire with 106 answered and validated using the Cronbach's alpha and Kaiser-Meyer-Olkin. Results: The construction companies identified the benefits and CSF in the use of EVM. The observed benefits were: achieving project cost, the definition of scope and schedule, anticipating project and project communication. The observed CSF were: team training, project management maturity, top management support, the need of pre-defined procedures, and the use of appropriate software. Limitations of the investigation: The sample of research was composed exclusively of Brazilian construction managers. Originality / Value: The EVM is widely used for project management. However, there are few studies on its use in the construction industry.
作者
我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。
推荐
暂无数据