3.8 Article

Production planning in 3D Printing factories

出版社

UNIVERSITAT POLITECNICA VALENCIA
DOI: 10.4995/ijpme.2020.12944

关键词

additive manufacturing; production planning; packing problem; optimization; nesting

资金

  1. project: Lonja de Impresion 3D para la Industria 4.0 y la Empresa Digital (LONJA3D) - Regional Government of Castile and Leon
  2. European Regional Development Fund (ERDF, FEDER) [VA049P17]

向作者/读者索取更多资源

Production planning in 3D printing factories brings new challenges among which the scheduling of parts to be produced stands out. A main issue is to increase the efficiency of the plant and 3D printers productivity. Planning, scheduling, and nesting in 3D printing are recurrent problems in the search for new techniques to promote the development of this technology. In this work, we address the problem for the suppliers that have to schedule their daily production. This problem is part of the LONJA3D model, a managed 3D printing market where the parts ordered by the customers are reorganized into new batches so that suppliers can optimize their production capacity. In this paper, we propose a method derived from the design of combinatorial auctions to solve the nesting problem in 3D printing. First, we propose the use of a heuristic to create potential manufacturing batches. Then, we compute the expected return for each batch. The selected batch should generate the highest income. Several experiments have been tested to validate the process. This method is a first approach to the planning problem in 3D printing and further research is proposed to improve the procedure.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据