3.8 Proceedings Paper

The 2nd in-grid operation of superconducting cable in Yokohama project

出版社

IOP PUBLISHING LTD
DOI: 10.1088/1742-6596/1559/1/012083

关键词

-

资金

  1. New Energy and Industrial Technology Development Organization (NEDO)

向作者/读者索取更多资源

The superconducting cable system was installed and operated in the real grid of Tokyo Electric Company (TEPCO) Holdings from 2012 to 2013, successfully. At this operation, the system had no degradation of its electrical and mechanical performances. After then, its cooling system was replaced to new turbo-Brayton refrigerator and the cable was re-connected to the grid in 2017. The cable system was successfully operated for another one year. In this operation, stable cooling system controlling, heat loads and vacuum rates of the cryostats etc. were observed continuously. After the operation, No Ic degradation of whole length was measured. In addition, the short sample cables cut from the system after the dismantlement, were applied with AC 90 kV and Imp 385 kV, successfully as the same condition of the shipping test in 2011. These results are one of the credibility confirmations for long time superconducting cable system operation.

作者

我是这篇论文的作者
点击您的名字以认领此论文并将其添加到您的个人资料中。

评论

主要评分

3.8
评分不足

次要评分

新颖性
-
重要性
-
科学严谨性
-
评价这篇论文

推荐

暂无数据
暂无数据